Evaluation of The National Strategic Project for The Construction of The Serang-Panimbang Expressway
DOI:
https://doi.org/10.65310/1bv26367Keywords:
National Strategic Project, Policy Evaluation, Expressway Development, Infrastructure Governance, Regional Connectivity.Abstract
This study evaluates the implementation of the Serang Panimbang Expressway as a National Strategic Project in Indonesia using William N. Dunn’s policy evaluation framework. The research employed an empirical qualitative approach through a single instrumental case study design. Data were collected through semi structured interviews with key stakeholders involved in project planning, implementation, and supervision, supported by documentary evidence from government reports and policy documents. The analysis focused on six evaluation dimensions consisting of effectiveness, efficiency, adequacy, equity, responsiveness, and appropriateness. The findings indicate that the project has significantly improved regional connectivity and strengthened development opportunities in previously less accessible areas. Implementation performance was influenced by land acquisition challenges, financial constraints, cost escalation, and administrative coordination issues that affected project timelines. Stakeholders generally perceived the project as strategically beneficial for regional economic growth, although concerns remained regarding the distribution of benefits, environmental impacts, and institutional responsiveness to public complaints. The study concludes that the project remains appropriate and justified within the National Strategic Project agenda because its long term public value exceeds the implementation challenges encountered. Strengthening environmental governance, community engagement, and interinstitutional coordination is essential to improve the sustainability and legitimacy of future infrastructure development initiatives.
Downloads
References
Al-Bayati, A. J., Ali, M., & Nnaji, C. (2023). Managing work zone safety during road maintenance and construction activities: Challenges and opportunities. Practice Periodical on Structural Design and Construction, 28(1), 04022068. https://doi.org/10.1061/PPSCFX.SCENG-1212
Ali, S. S., & Batool, A. (2024). Integration of strategic environmental assessment (SEA) in motorway/highway planning and construction: A case study for sustainable infrastructure development in Pakistan. NUST Journal of Natural Sciences, 9(4). https://doi.org/10.53992/njns.v9i4.225
Al-Mhdawi, M. K. S., O'connor, A., Qazi, A., Rahimian, F., & Dacre, N. (2025). Review of studies on risk factors in critical infrastructure projects from 2011 to 2023. Smart and Sustainable Built Environment, 14(2), 342-376. https://doi.org/10.1108/SASBE-09-2023-0285
Anarta, R., Nata, R. A., Syahmer, V., & Khairunnisa, E. I. (2025). Performance and Suitability of Class B-1 Concrete Mix for the Serang-Panimbang Toll Road, Indonesia: A Case Study on Strength, Sustainability, and Material Specifications from Mining. PaperASIA, 41(3b), 121-133. https://doi.org/10.59953/paperasia.v41i3b.486
Badan Pengatur Jalan Tol. (2022). Progres konstruksi jalan tol Serang–Panimbang. Kantor Bersama KPBU Kementerian Keuangan. https://kpbu.kemenkeu.go.id/berita/read/1437/progres-konstruksi-jalan-tol-serang-panimbang
Bahfein, S., & Alexander, B. H. (2026, April 30). Apa kabar proyek Tol Serang–Panimbang? Kompas.com. https://www.kompas.com/properti/read/2026/04/30/070000821/apa-kabar-proyek-tol-serang-panimbang
Creswell, J. W. (2013). Qualitative inquiry and research design: Choosing among five approaches (3rd ed.). Sage Publications.
Dahalan, N. H., Rahman, R. A., Ahmad, S. W., & Che Ibrahim, C. K. I. (2025). Public monitoring of environmental management plan implementation in road construction projects: Key performance indicators. Journal of Engineering, Design and Technology, 23(3), 766-791. https://doi.org/10.1108/JEDT-06-2023-0225
Direktorat Jenderal Bina Marga, Kementerian Pekerjaan Umum dan Perumahan Rakyat. (2022, August 8). Pembangunan Tol Serang–Panimbang seksi III dimulai. https://binamarga.pu.go.id/index.php/berita/pembangunan-tol-serang-panimbang-seksi-iii-dimulai
Direktorat Jenderal Bina Marga, Kementerian Pekerjaan Umum. (2026). Wapres Gibran dan Wamen PU tinjau pembangunan Jalan Tol Serang–Panimbang seksi 2. https://binamarga.pu.go.id/balai-banten/publikasi/detailberita/wapres-gibran-dan-wamen-pu-tinjau-pembangunan-jalan-tol-serang-panimbang-seksi-2
Dunn, W. N. (2003). Pengantar analisis kebijakan publik. Gadjah Mada University Press.
Kementerian Keuangan Republik Indonesia. (2025, February 26). Menjaga keberlanjutan PSN: Strategi efektif dalam menyeimbangkan pembangunan dan efisiensi. Direktorat Jenderal Kekayaan Negara. https://www.djkn.kemenkeu.go.id/artikel/baca/17514/Menjaga-Keberlanjutan-PSNStrategi-Efektif-dalam-Menyeimbangkan-Pembangunan-dan-Efisiensi
Kementerian Pekerjaan Umum dan Perumahan Rakyat. (2022, May 19). Tol Serang–Panimbang beroperasi penuh 2024, begini progresnya. Bisnis.com. https://ekonomi.bisnis.com/read/20220519/45/1534589/tol-serang-panimbang-beroperasi-penuh-2024-begini-progresnya
Kementerian Pekerjaan Umum dan Perumahan Rakyat. (2023, August 16). Kementerian PUPR terus selesaikan Tol Serang–Panimbang, seksi 2 dan 3 tuntas 2024. https://pu.go.id/berita/kementerian-pupr-terus-selesaikan-tol-serang-panimbang-seksi-2-dan-3-tuntas-2024
Kementerian Pekerjaan Umum. (2026, April 29). Kementerian PU lanjutkan penyelesaian Tol Serang–Panimbang secara bertahap, perkuat konektivitas. https://sahabat.pu.go.id/eppid/berita/detail/kementerian-pu-lanjutkan-penyelesaian-tol-serang-panimbang-secara-bertahap-perkuat-konektivitas
Kompas.com. (2023, September 6). Proyek Tol Serang–Panimbang terganjal dana. https://www.kompas.com/properti/read/2023/09/06/193000621/proyek-tol-serang-panimbang-terganjal-dana
Kompas.com. (2025, August 25). Tol Serang–Panimbang jadi prioritas nasional 2026, ditargetkan beroperasi penuh 2027. https://nasional.kompas.com/read/2025/08/25/17561011/tol-serang-panimbang-jadi-prioritas-nasional-2026-ditargetkan-beroperasi
Kontan. (2026, January 27). Biaya Tol Serang–Panimbang membengkak Rp1,6 triliun, begini penjelasan BPJT. https://nasional.kontan.co.id/news/biaya-tol-serang-panimbang-membengkak-rp-16-triliun-begini-penjelasan-bpjt
KPBU Kementerian Keuangan. (2022). Perkembangan proyek Jalan Tol Serang–Panimbang. https://kpbu.kemenkeu.go.id/berita/read/1396/perkembangan-proyek-jalan-tol-serang-panimbang
Lee, E. H., & Park, H. C. (2025). Publicness in highway projects: A multi-criteria decision-making approach to public-private partnerships. Socio-Economic Planning Sciences, 98, 102154. https://doi.org/10.1016/j.seps.2025.102154
Mohamed, M., & Tran, D. Q. (2023). Content analysis of e-inspection implementation for highway infrastructure construction projects. Engineering, construction and architectural management, 30(7), 2621-2644. https://doi.org/10.1108/ECAM-08-2021-0699
Naim, M., Mufariq, A., Winarno, A., & Hermana, D. (2024). Identifying the actual beneficiaries of toll road development policies in rural communities: ex-ante evaluation approaches. Cogent Social Sciences, 10(1), 2328387. https://doi.org/10.1080/23311886.2024.2328387
Ombudsman Republik Indonesia. (2025). Banjir diduga akibat pembangunan Tol Serang–Panimbang, Ombudsman minta warga Cisangu Lebak lapor. https://share.google/qJUnZ1xrO6cyxfuvf
Patel, K., & Ruparathna, R. (2023). Life cycle sustainability assessment of road infrastructure: a building information modeling-(BIM) based approach. International Journal of Construction Management, 23(11), 1837-1846. https://doi.org/10.1080/15623599.2021.2017113
Portonews. (2026, April 30). Progres Tol Serang–Panimbang hampir tuntas, seksi 2 segera rampung. https://portonews.com/2026/pernik-bisnis/infrastruktur/progres-tol-serang-panimbang-hampir-tuntas-seksi-2-segera-rampung
Prasetia, M. M. (2025, August 13). Pengusaha dan masyarakat Pandeglang desak pembangunan Tol Serang–Panimbang dikebut. Radar Banten. https://www.radarbanten.co.id/2025/08/13/pengusaha-dan-masyarakat-pandeglang-desak-pembangunan-tol-serang-panimbang-dikebut
Priyanto, N., Faris, F., & Setiawan, H. (2024). Liquefaction potential and severity analysis on road embankment in Serang-Panimbang Toll Road Section 3. In E3S Web of Conferences (Vol. 576, p. 03005). EDP Sciences. https://doi.org/10.1051/e3sconf/202457603005
Qin, X., Wang, Y., Cui, S., Liu, S., Liu, S., & Wangari, V. W. (2023). Post-assessment of the eco-environmental impact of highway construction–A case study of Changbai Mountain Ring Road. Environmental Impact Assessment Review, 98, 106963. https://doi.org/10.1016/j.eiar.2022.106963
Radzi, A. R., Rahman, R. A., Doh, S. I., & Esa, M. (2022). Construction readiness for highway projects: Key decision criteria. Journal of Construction Engineering and Management, 148(2), 04021196. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002237
Ridwan, M. (2025, February 7). Ngadu ke DPRD Lebak, warga Desa Cisangu desak solusi atasi lahan sawah banjir akibat proyek Tol PT WIKA. Portal Lebak. https://portallebak.pikiran-rakyat.com/nasional/pr-299043244/ngadu-ke-dprd-lebak-warga-desa-cisangu-desak-solusi-atasi-lahan-sawah-banjir-akibat-proyek-tol-pt-wika
Sharma, K., & Trivedi, M. K. (2023). Statistical analysis of delay-causing factors in Indian highway construction projects under hybrid annuity model. Transportation Research Record, 2677(10), 572-591. https://doi.org/10.1177/03611981231161594
Subramanya, K., Kermanshachi, S., & Pamidimukkala, A. (2022). Evaluation of e-Ticketing technology in construction of highway projects: A systematic review of adoption levels, benefits, limitations and strategies. Frontiers in Built Environment, 8, 890024. https://doi.org/10.3389/fbuil.2022.890024
Tempo.co. (2024). Profil Tol Serang–Panimbang yang sebagian dibiayai utang dari Cina. https://www.tempo.co/ekonomi/profil-tol-serang-panimbang-yang-sebagian-dibiayai-utang-dari-cina-310477
Wang, H., Tao, J., Xu, J., & Zhang, Y. (2023). Research on an evaluation index system and evaluation method of green and low-carbon expressway construction. PloS one, 18(3), e0283559. https://doi.org/10.1371/journal.pone.0283559
Wijewantha, P., & Kulatunga, U. (2022). A framework to assess environmental sustainability of expressway projects in Sri Lanka. Management of Environmental Quality: An International Journal, 33(6), 1404-1420. https://doi.org/10.1108/MEQ-09-2021-0220
Willar, D., Trigunarsyah, B., Dewi, A. A. D. P., & Makalew, F. (2023). Evaluating quality management of road construction projects: a Delphi study. The TQM Journal, 35(7), 2003-2027. https://doi.org/10.1108/TQM-04-2022-0132
Wu, L., Ye, K., & Hastak, M. (2022). A comparison study on environmental policies for expressway construction projects between China and the US: A tiered analysis approach. Journal of environmental management, 305, 114298. https://doi.org/10.1016/j.jenvman.2021.114298
Yang, S., Zhang, L., & Zhu, G. (2023). Effects of transport infrastructures and climate change on ecosystem services in the integrated transport corridor region of the Qinghai-Tibet Plateau. Science of the Total Environment, 885, 163961. https://doi.org/10.1016/j.scitotenv.2023.163961
Ye, K., Guo, Z., Zhang, W., & Liang, Y. (2022). Heterogeneous environmental policy tools for expressway construction projects: A crossregional analysis in China. Environmental Impact Assessment Review, 97, 106907. https://doi.org/10.1016/j.eiar.2022.106907
Zhang, K., Chen, M., Yang, Y., Zhong, T., Zhu, R., Zhang, F., ... & Yan, J. (2022). Quantifying the photovoltaic potential of highways in China. Applied Energy, 324, 119600. https://doi.org/10.1016/j.apenergy.2022.119600