(1)
Optimizing the Expansion and Engineering of X-XP Express’s Logistics Facilities in West Java to Handle Surge in Shipping Volume During the “Twin Dates” and “Pay Day Sale” Periods. Mercatura Lumina 2026, 1 (2), 259-268. https://doi.org/10.65310/8432yn73.